TAM 6.25% 3.4¢ tanami gold nl

d day, page-22

  1. 8,323 Posts.
    lightbulb Created with Sketch. 905
    the current underground mining costs will be significant until they get their stopes on line - that will be pay day.

    One of the other issues difficult to manage with these orebodies is the feast or famine of stope ore.

    This is the sequence: drive development, mapping, modelling, stope design, drilling, rising, blasting, haulage.

    With small stopes, blasting and haulage takes a relatively short period of time - especially in comparison to drive development. Stope ore is obviously cheaper to mine and higher grade. A flexible mine plan is required, as issues often arise.

    Ive clipped and painted the nails, now onto the nose hairs. Tommorrow maybe the BS&C
 
watchlist Created with Sketch. Add TAM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.