TAM 6.25% 3.4¢ tanami gold nl

the current underground mining costs will be significant until...

  1. 8,323 Posts.
    lightbulb Created with Sketch. 905
    the current underground mining costs will be significant until they get their stopes on line - that will be pay day.

    One of the other issues difficult to manage with these orebodies is the feast or famine of stope ore.

    This is the sequence: drive development, mapping, modelling, stope design, drilling, rising, blasting, haulage.

    With small stopes, blasting and haulage takes a relatively short period of time - especially in comparison to drive development. Stope ore is obviously cheaper to mine and higher grade. A flexible mine plan is required, as issues often arise.

    Ive clipped and painted the nails, now onto the nose hairs. Tommorrow maybe the BS&C
 
watchlist Created with Sketch. Add TAM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.