Itsagas, $1 equals 3b cap fully diluted.
Azure is 1.8b and 1.5 years in front on Rdn on drilling.
To be 1b cap, needs plus 20,000m at a andover south, but more like 30,000 plus.
They do have enough funds to do these meters.
For a strike of 500m minimum on something like 10 holes 50m spaced.
Envisage this end qtr 2 next year at the earliest.
- Forums
- ASX - By Stock
- Daily Discussion
Itsagas, $1 equals 3b cap fully diluted.Azure is 1.8b and 1.5...
-
- There are more pages in this discussion • 4,961 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RDN (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.4¢ |
Change
-0.001(2.86%) |
Mkt cap ! $96.91M |
Open | High | Low | Value | Volume |
3.5¢ | 3.6¢ | 3.4¢ | $240.7K | 6.931M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
21 | 1891088 | 3.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.4¢ | 464539 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
21 | 1891088 | 0.033 |
17 | 2826250 | 0.032 |
15 | 2912652 | 0.031 |
20 | 2490509 | 0.030 |
9 | 1954856 | 0.029 |
Price($) | Vol. | No. |
---|---|---|
0.034 | 464539 | 3 |
0.035 | 1730488 | 9 |
0.036 | 4973419 | 17 |
0.037 | 2994075 | 12 |
0.038 | 1275403 | 6 |
Last trade - 13.35pm 18/09/2024 (20 minute delay) ? |
Featured News
RDN (ASX) Chart |