I'd said Feb/Mar for results around November (I think?) last year with an explanation on how approvals processes are held up during lore time and summer. I've worked drilling previously, I currently work in the sampling space now and I've checked in with old colleagues who are currently TO/heritage team leaders and all of that has combined to give me that date.
Could sway either way but here's some rough thoughts for my march +-1 month prediction -
- General practice would be lore ending around Christmas and a slow start up due to summer heat. A lot of teams shut down over summer (don't forget a lot of exploration has only just fired back up too) Dusko did mention he had some good comms with the TO's but even so I feel best case scenario would be end of this month for full approvals. Feeling is more like mid Feb.
- My experience is in RC however I've just stuck my head out the office and queried with an ex diamond driller, average meterage would probably be around 50-100m per day for surface depending on ground. Hard rock can send a 1.5m rod in 30 min and detrital ground can have half a rod in a day. I'd expect pretty hard ground with what we are looking for, I can't remember from the AGM what the total meterage planned was but I did ask how many rigs/plan of attack and the question was skirted haha. I would expect we will probably have 2-3 rigs with the first core samples getting sent off within 1-2 weeks (mid to late Feb.)
- turnaround time might actually have improved given the slight dip in pressure and pull back from a couple of larger ops however I still think 2-3 weeks turn around was pretty optimistic, less so now given industry conditions but I will give the benefit of the doubt and say 2-3 weeks from rod pull to results. This gives us early March ball park.
I'm not an expert by any means and I don't have a damn clue what any of the trading lines and charts means but I don't trade I invest and like a lot of you have said, it's all p*ss in the wind until each of these steps occurs. I think I have a justifiable amount of exposure to the industry to stand by my timeline, if nothing else purely because I understand the bloat and red tape in the industry. I'd hoped for a Chrissy gift too and I'd love to be proven wrong/will eat humble pie with a smile on my face if any of these stages happen earlier but the realist inside me tells me March is a pretty good date to aim for.
As Alex Jones says...DYOR
- Forums
- ASX - By Stock
- Daily Discussion
I'd said Feb/Mar for results around November (I think?) last...
-
- There are more pages in this discussion • 2,532 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RDN (ASX) to my watchlist
|
|||||
Last
3.1¢ |
Change
-0.001(3.13%) |
Mkt cap ! $84.11M |
Open | High | Low | Value | Volume |
3.1¢ | 3.2¢ | 3.1¢ | $324.4K | 10.43M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 709983 | 3.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.2¢ | 970000 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 709983 | 0.031 |
25 | 4392595 | 0.030 |
10 | 3138361 | 0.029 |
14 | 4391748 | 0.028 |
5 | 1969500 | 0.027 |
Price($) | Vol. | No. |
---|---|---|
0.032 | 970000 | 5 |
0.033 | 977737 | 5 |
0.034 | 488280 | 2 |
0.035 | 798283 | 4 |
0.036 | 1674201 | 7 |
Last trade - 16.10pm 17/06/2024 (20 minute delay) ? |
|
|||||
Last
3.1¢ |
  |
Change
-0.001 ( 3.13 %) |
|||
Open | High | Low | Volume | ||
3.1¢ | 3.2¢ | 3.0¢ | 6300715 | ||
Last updated 15.54pm 17/06/2024 ? |
Featured News
RDN (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online