I take it your not from WA. The engineer and fabrication shops are booked out for 12 months minimum at the moment. Even if EPA, and mine design was complete tomorrow there is still at least 12 months wait. That's without delays in construction.I'm not happy about it either, I bought my main parcel after watching the stock for over six months, off the back of Bruce's interviews and frustration at the daily price manipulation.I had an original fair value estimate at 25cents, but bought in at over 30 due to this misinformation.
- Forums
- ASX - By Stock
- Daily price prediction thread
I take it your not from WA. The engineer and fabrication shops...
-
- There are more pages in this discussion • 7,882 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VRX (ASX) to my watchlist
|
|||||
Last
3.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $23.87M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 188590 | 3.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.8¢ | 12377 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 188590 | 0.036 |
2 | 20821 | 0.035 |
1 | 45454 | 0.033 |
4 | 282063 | 0.032 |
1 | 302425 | 0.031 |
Price($) | Vol. | No. |
---|---|---|
0.038 | 12377 | 1 |
0.039 | 69999 | 2 |
0.040 | 20000 | 1 |
0.042 | 171626 | 2 |
0.043 | 28768 | 1 |
Last trade - 16.12pm 16/07/2024 (20 minute delay) ? |
Featured News
VRX (ASX) Chart |
Day chart unavailable