Been thinking a lot about this project and investment.
Starting at surface is awesome, however with a 30 degree dip and such a long strike. Would this not mean E.g 1km along strike the mineralisation would be around 100 below surface and further more 2km down strike be 200m below surface? At this point in time cost saving is reduced.
The isolated project location and slightly lower grade could be overcome with a better opex from shallow mining but for how long does it really remain shallow?
- Forums
- ASX - By Stock
- TM1
- Dante Reefs and Terra Metals Review
Dante Reefs and Terra Metals Review, page-5
-
- There are more pages in this discussion • 88 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TM1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $15.03M |
Open | High | Low | Value | Volume |
3.8¢ | 4.1¢ | 3.8¢ | $14.54K | 368.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 109988 | 3.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.1¢ | 221320 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 109988 | 0.038 |
1 | 100000 | 0.037 |
2 | 33611 | 0.036 |
1 | 44117 | 0.034 |
1 | 102999 | 0.032 |
Price($) | Vol. | No. |
---|---|---|
0.041 | 221320 | 2 |
0.042 | 44482 | 1 |
0.044 | 19999 | 1 |
0.046 | 457758 | 1 |
0.047 | 66735 | 1 |
Last trade - 15.59pm 02/10/2024 (20 minute delay) ? |
Featured News
TM1 (ASX) Chart |