SHA 0.50% $2.01 shape australia corporation limited

kurnalpi nickel project drilling now 14 target

  1. 2,257 Posts.
    The Kurnalpi Nickel Project area covers a largely concealed
    northnorthwesterly trending ultramafic sequence. Previous
    exploration drilling has been assessed in order to estimate
    the exploration target size of a nickel laterite deposit present
    over a portion of the area of interest.
    Based on a lower cut-off of 0.7% nickel and including
    internal waste, the Exploration Target is estimated to be
    within the following range:
    Kurnalpi Nickel Exploration Targets:
    Lower range:
    3.9 Million Tonnes at 0.95% nickel and 0.09% cobalt
    Upper range:
    4.3 Million Tonnes at 0.95% nickel and 0.09% cobalt
    SHANNON
    Resources Ltd
    www.shannonresources.com 2
    Mackay & Schnellmann Pty Ltd was commissioned by Shannon Resources Limited
    to assess extant drilling and related geophysical data available from DOIR open and
    closed file archives with the objective of delineating nickel exploration targets
    covering portions of the company’s tenements at Kurnalpi, Western Australia.
    The focus of the study was ground, designated the Kurnalpi Nickel Project, covered
    by Mining Lease Application 28/185, Exploration Licence 28/1477 and P28/1037. The
    area underlain by a poorly exposed northnorthwesterly trending folded and faulted
    ultra-mafic-mafic sequence which, on the basis of magnetic data, extends over a
    strike length of some ten kilometres within the project area.
    Further investigation of the available exploration drilling and EM geophysical data
    was undertaken for the vicinity of the small nickel laterite deposit with a view to the
    selection of future drilling targets aimed at testing the Kurnalpi Nickel Project area for
    potential nickel sulphide mineralisation at depth. This study has identified 14
    drilling targets for future investigation recommended to be initially tested by utilizing
    RC drilling for an estimated total of 3200 metres and by downhole EM techniques.
    Drilling is to commence in January 2007 to test the 14 identified nickel sulphide
    targets.
 
watchlist Created with Sketch. Add SHA (ASX) to my watchlist
(20min delay)
Last
$2.01
Change
-0.010(0.50%)
Mkt cap ! $167.8M
Open High Low Value Volume
$2.02 $2.02 $2.01 $8.057K 4.001K

Buyers (Bids)

No. Vol. Price($)
1 511 $2.01
 

Sellers (Offers)

Price($) Vol. No.
$2.08 2853 1
View Market Depth
Last trade - 15.40pm 26/04/2024 (20 minute delay) ?
SHA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.