Hi Joannie.LTR was always under pressure when the bid failed....

  1. 4,516 Posts.
    lightbulb Created with Sketch. 241
    Hi Joannie.
    LTR was always under pressure when the bid failed. Taking to account the sinking lithium price adding to the pressure.
    Always a tough gig bringing a resource of this huge project patience will be key.
    Lots of things to consider but all things considered the interest alone says it will be a winner.
    Huge companies know how good this deposit is so hang in there.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.