MGV
ASX RELEASE 19 August 2016
Gold Continues at Break of Day
RC drilling extends hanging-wall gold mineralisation to over 360 metres of strike at Break of Day o 2m @ 12.5g/t Au from 101m down hole (16MORC022) in the hanging-wall vein o 4m @ 5.9g/t Au from 36m down hole (16MORC018) in the hanging-wall vein o The hanging-wall vein is open to the north and down dip The footwall vein also remains open to the north and down dip
Drilling will re-commence at Break of Day in two weeks to drill test extensions to both the footwall and hanging-wall veins
- Forums
- ASX - Day Trading
- Day Trading 19 Aug Pre Market
MGV ASX RELEASE 19 August 2016 Gold Continues at Break of Day ...
-
- There are more pages in this discussion • 11 more messages in this thread...
This thread is closed.
You may not reply to this discussion at this time.
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Featured News
NEWS
Breakthrough programs slash healthcare events, driving a significant A$1.8M+ annual revenue boost
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review