Day Trading 23 May Pre Market, page-19

  1. 13,333 Posts.
    lightbulb Created with Sketch. 93
    Thanks Jim, Ben & All regulars;

    Back to business.

    Stocks for the week (the one without announcement) : SCI, MXC, XPE/XPEOB

    GPH/GPHO : Good announcement, the one i have been waiting for patiently after buying for ST. Shall move up to break that 13-14c resistance as more results yet to come.

    First assays from the key basal sands at the Lake Wells Potash Project reveal wide intersections and high grades of the premium-priced Sulphate of Potash (SOP) • Intersections of both upper sands and basal sands indicate potential for potash-bearing aquifers in both sand layers • Average grades are comfortably in line with Goldphyre’s publicly-stated Exploration Target • First round results include: Hole ID Sample interval SOP grade Basal sand Upper sand Basal sand Upper sand PLAC020 18m 12m 9,046 mg/l 5,921 mg/l PLAC019 12m 18m 8,363 mg/l 6,571 mg/ PLWDD002 18m * 9,745 mg/l * PLWDD003 24m * 9,277 mg/l * PLAC018* 7m 18m 9,585 mg/l 10,243 mg/l PLWDD005 ^ 4.25m ^ 8,496 mg/l * Hole cased through the upper sand with no sample taken REFER TO LONG SECTION 1 BELOW ^ Hole not sampled in the basal layer REFER TO LONG SECTION 1 BELOW • Results will be combined with those still to come from the remaining seven recently-completed holes to finalise the Maiden Resource • Assays for remaining 7 holes imminent • Test production bores to be installed into the upper and lower aquifers at two sites: test pumping planned for Q3
  2. This thread is closed.

    You may not reply to this discussion at this time.

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.