PSC - project acquisition which is surrounded by multi million ounces of gold...
Now check this out:
Presso is interesting read...
4 main drill targets discovered to date:

Mututolwa Target - 1,276m drilling has tested 3km gold structure (incl. 400m strike @7g/t over 1m and 600m strike @ 6g/t over 1m).
Kamalingela South – >2.5km strike, active artisanal workings  Kamalingela Nord Target - 1.2km strike active artisanal workings 
Kansatu Target - 1km gold target defined by surface sampling including: trenching over 200m strike at 6g/t over 1m and a further 200m strike of grab sampling 2-32g/t 
Mt Kalema Target - 0.8km strike-length gold target. Channel sample on the northern wall reported 31m of 5g/t gold and a high grade halo to the old mine
- Forums
- ASX - Day Trading
- Day Trading Monday April 4 - Morning
Day Trading Monday April 4 - Morning, page-63
-
- There are more pages in this discussion • 215 more messages in this thread...
This thread is closed.
You may not reply to this discussion at this time.
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)