RR1 ann out --- HASE 2 DRILLING INCREASES SCALE OF MORRISSEY HILL LITHIUM PROJECT, YINNETHARRA, W.A.
HIGHLIGHTS
● Phase 2 Drilling has significantly elevated the scale of lithium potential at Morrissey Hill with
drilling confirming the presence of multiple, thick, stacked pegmatites1 within a previously unrecognised package of the Leake Springs Metamorphics, at Morrissey Hill South.
A total of 57 holes for 5,282m of RC drilling has been completed to date during Phase 2 drilling, with all samples already sent to the laboratory for analysis.
- Forums
- ASX - Day Trading
- Day trading pre-market open December 15
RR1 ann out --- HASE 2 DRILLING INCREASES SCALE OF MORRISSEY...
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity