Day trading pre-market open December 29, page-14

  1. 6,486 Posts.
    lightbulb Created with Sketch. 175
    ERM
    Is worth considering, with drill results due end Dec early Jan, from the High-Grade Golden Forty Project in Tennant Creek.
    Also waiting for the TCMG processing plant.
    Currently sitting in over sold territory and has floored at 5.5cps
    Low SOI
    COH $4.9 mil

    Golden Forty Project
    The 2022 drilling intersected very significant and high-grade zones including:
    o 28m at 28.3 g/t gold from 141m (GFRC063) including:
    ▪ 9m at 84.6 g/t gold from 145m
    o 15m at 8.4g/t gold from 103m (GFDD059)
    o 6m at 41.2 g/t gold from 120m (GFRC060)
    o 13m at 4.1 g/t gold from 87m (within 35m @ 1.8g/t Au from 69m in GFRC058)
    o 6m at 5.4g/t gold from 155m (GFRC066)
    o 3m at 8.0 g/t gold from 132m (GFRC061)
    o 4m @ 6.8 g/t gold from 140m (within 21m @ 1.9 g/t Au in GFRC065)
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.