Day trading pre-market open February 7, page-32

  1. 5,962 Posts.
    lightbulb Created with Sketch. 3
    NHE
    Mbelele lab results confirm high helium concentrations
    at North Rukwa Project
    Highlights
    • Helium concentration of 2.46% confirmed in highly permeable reservoirs at the North Rukwa
    Project’s Mbelele prospect
    • Full section net reservoir increased by over three times to 148m in Mbelele-1 and almost two
    times to 271m in Mbelele-2 after whole wellbore petrophysics analysis
    • Hydrogen shows at up to 1,500 times background consistently for the upper 350m of Mbelele-2
    • Funding in place to complete all required appraisal work.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.