NHE
Mbelele lab results confirm high helium concentrations
at North Rukwa Project
Highlights
• Helium concentration of 2.46% confirmed in highly permeable reservoirs at the North Rukwa
Project’s Mbelele prospect
• Full section net reservoir increased by over three times to 148m in Mbelele-1 and almost two
times to 271m in Mbelele-2 after whole wellbore petrophysics analysis
• Hydrogen shows at up to 1,500 times background consistently for the upper 350m of Mbelele-2
• Funding in place to complete all required appraisal work.
- Forums
- ASX - Day Trading
- Day trading pre-market open February 7
Day trading pre-market open February 7, page-32
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)