Day trading pre-market open July 21, page-24

  1. 2,897 Posts.
    OEX Cambay C-77H Re-frac Operations has commenced. --- All outstanding equipment necessary for the re-frac operation (the coiled tubing unit) arrived onsite on 19 July 2022, The initial stage of the re-fraccing operation, perforating the zones to be hydraulically fractured, commenced on 20 July 2022.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.