Day trading pre-market open June 15, page-24

  1. 14,831 Posts.
    lightbulb Created with Sketch. 2276


    CAZ .057c MC only $21 Million with $10 Million cash, drilling underway for high grade Copper.
    Previous results from work conducted by Cazaly at Mount Angelo included; 64m @ 2.72% Cu (1.13% Zn), 62m @ 2.41% Cu (2.75% Zn), 37m @ 2.63% Cu (6.05% Zn), 16m @ 5.91% Cu, 18m @ 2.53% Cu

    PRL
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.