MSR ann. Two contiguous new licence applications made over an...

  1. 5,049 Posts.
    lightbulb Created with Sketch. 630
    MSR ann.

    • Two contiguous new licence applications made over an area covering 780km2;
    • Permits cover a 40km long major shear zone that has the potential to host gold mineralisation;
    • 100% ownership of Tortiya Gold Project.

    • Monthly chart
    • https://hotcopper.com.au/data/attachments/2141/2141798-295311b6e4feefebc98075dcbe26654c.jpg

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.