AW1 halt for results on Storm project...could this be the...

  1. 37,879 Posts.
    lightbulb Created with Sketch. 253
    AW1 halt for results on Storm project...could this be the motherlode they located below?


    RDN 3.1c is the key breaker and one to watch if it breaks above with volume.....30mins chart

    https://hotcopper.com.au/data/attachments/5555/5555289-0a68ee492285e7d5d108975e89d95f14.jpg
    Last edited by HungHing: 01/09/23
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.