ARM: $2.50-$3.40 for every 10m tonnes of manganese they discover...

  1. 12,893 Posts.
    ARM: $2.50-$3.40 for every 10m tonnes of manganese they discover and I'm hearing they could have many multiples of than but lets wait for the drill results. My target prior to drilling is now upgraded to $1.50.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.