daytraders weekend lounge – 11 november, page-9

  1. 4,331 Posts.
    DLM if you take the time and look through the broker presentation from July you will see the drilling footprint alone in the northwest corner exceeds what RUM have drilled on their side, this area alone is 6km X 4km that NUP have hammered out. If this zone delivers an average of 5m thickness which is less than RUM's 6.5m average we will be looking at 200m Tonnes. This dosnt include anything from the nearly 30km X 2km drilled to the east or the other 10km X 3km section drilled on Limestone Bore. Im really surprised at the amount of strike that NUP have gone after. If you add it all up you are looking at an area of in excess of 100sq km has been targeted most of which is wide fenced drill lines. The company has really sunk its teeth into this drilling program as far as ground covered.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.