TH - intersections are:* A total of 103 metres of copper...

  1. 2,403 Posts.
    TH - intersections are:

    * A total of 103 metres of copper mineralisation intersected in BF10RC02

    * 27m @ 0.51% Cu and 505ppm Co from 128m, including 7m @ 1.14% Cu and 967ppm Co from 136m, and 57m @ 0.69% Cu, 288ppm Co and 4.26g/t Ag from 163m, including 12m @ 2.48% Cu and 703ppm Co from 207m inBF10RC02

    * 17m @ 1.08% Cu, 693ppm Co and 1.82g/t Ag from near surface, and 17m @ 1.51% Cu, 474ppm Co and 7.22g/t Ag from 78m inBF10RC01

    * 18m @ 0.38% Cu, 1034ppm Co and 1.75g/t Ag from 180m, and
    7m @ 1.18% Cu, 459ppm Co and 1.22g/t Ag from 204m inBF10RC04

    * 4 out of 5 holes returned ore-grade intervals, representing an exploration success of 80%
  2. This thread is closed.

    You may not reply to this discussion at this time.

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.