re HDG deal
a bit of confusion me thinks
this is why its a gift
75% of project costs 3.5 million
if they want the other 24% it could be 150 million for 1.5 billion tonnes
just read the AFR presso and look at thier cap
see the railway lines proposed, next to botswanas only operating mine and coal fired power station
- Forums
- ASX - Day Trading
- daytrades march 9 afternoon
daytrades march 9 afternoon, page-86
-
- There are more pages in this discussion • 125 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review