re HDG deala bit of confusion me thinksthis is why its a gift75%...

  1. 22,480 Posts.
    lightbulb Created with Sketch. 816
    re HDG deal

    a bit of confusion me thinks


    this is why its a gift


    75% of project costs 3.5 million


    if they want the other 24% it could be 150 million for 1.5 billion tonnes

    just read the AFR presso and look at thier cap


    see the railway lines proposed, next to botswanas only operating mine and coal fired power station
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.