mii drill results o 5.0m @ 22.4% Pb+Zn in KW10-026 o 12.0m @ 20.4% Pb+Zn in KW10-035 o 23.0m @ 11.3% Pb+Zn in KW10-049 o 9.0m @ 19.8% Pb+Zn in KW10-054 o 19.0m @ 19.4% Pb+Zn in KW10-056 o 9m @ 15.2% Pb+Zn in KW10-070 o 9m @ 22.5% Pb+Zn in KW10-071
versus ovr
? 19.0 metres at 8.4% zinc from 33.0 metres, within ? 46.8 metres at 4.6% zinc from 5.2 metres in DY10-024. ? 8.0 metres at 3.8% zinc from 87.0 metres in DY10-024, and ? 8.0 metres at 19.4% zinc from 80.0 metres in DY10-025.