daytrading april 11 morning, page-297

  1. 37,911 Posts.
    lightbulb Created with Sketch. 828
    ELM

    two more drill holes ain't going to make much difference since ELM already has a massive resource

    the aim of the drill holes was to prove up more 50% KCI potash so ELM could adjust their feasibility study for a lower capex & opex scenario for the 1st five years of production

    so the two new drill holes, while being superb (37% KCI) were essentially failures rather than successes

    these two holes make little difference to ELM

    what will change ELM is JV arrangements

    regards
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.