-
Share
5,881 Posts.
56
30/08/13
13:06
Share
Yep I Mean TNP woops havent even started on the scotch yet
Through 1c now if support builds it,ll pop good Ann.
"the coal seam thickness has been a surprise on the upside
in this well with numerous seams thicker than 7 meters"
Based on the increase in total coal seam thickness and
conclusions in the well completion report, Triple
management believes that a recalculation of the Gas in
Place (GIP) numbers is expected to result in a significant
increase in the GIP volumes previously reported.
-