KGL,20,000 metre RC and diamond drilling program is scheduled to...

  1. 5,997 Posts.
    lightbulb Created with Sketch. 101

    KGL,

    20,000 metre RC and diamond drilling program is scheduled to commence at Jervois in August to increase the size of the Resource.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.