As Giz pointed out, alot of people not reading the report properly
At those grades, they will have probably around 500k oz open cuttable, the rest will be bloc caved
Anyone thinking this isn't commercial should spend 5 - 10 mins doing some research
Surface to 576m @ 1.3g/t alone is a few M oz's already
If mineralisation continues to 800m, that is between 3 - 4Moz by their conceptual target
It will be cheaper opex to block cave this then some underground mines in Aus
- Forums
- ASX - Day Trading
- daytrading july 17 morning
daytrading july 17 morning, page-74
-
- There are more pages in this discussion • 120 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
MND
Albemarle lithium downsize burns $200M hole in Monadelphous's pocket as latter's contracts terminated
Featured News
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares