Put this on your watchlist guys, HEG owns two gold mines in NSW.
Hargraves Gold Mine Development Proposal Summary Economics
- Initial production of ~100,000 ounces over four years at
- Production rate 300,000 tonnes per year at 2.5g/t from two initial open pits
- 11:1 waste to ore stripping ratio at a pit design gold price of A$1,450/oz
- Gold recovery of 95%
- Pre-development cost of A$2m and project capital of A$13m
- Net profit of ~A$40m after full cost recovery / royalty payments at A$1,600/oz
- Potential for Hargraves development extensions at same production rate
- Potential development of Red Hill deposit may add significant net profit
Hill End Project
- A proposal to test and develop the upper levels of the Hill End Deposit involves initial drill testing the Frenchmans – Stevens wide-zone to extend the existing resource and develop a nominal target of 250,000 – 400,000 tonnes at 5 - 8 g/t gold. The project development would include a short decline and three initial levels at 24m spacing. Existing drill intersections indicate the wide zone is 3 - 8 metres wide and carries the target grade where it has been intersected in earlier development and in underground drilling.
- The Company has a 100% beneficial interest in its Hill End tenements, while a portion of the ground now encompassed by EL 5868 which includes resources at Hill End and Red Hill is subject to a reduction to 85% if an ‘economic feasibility study’ is completed by the Company, and First Tiffany Resource Corporation, if it establishes that it continues to hold a right against the Company to do so, contributes at the 15% level.
Market Cap. Less than $4M.
Recently raised funds at 0.003, share price at 0.002.
Big support from HK investors, check out the most recent substantial holding notices.
Please do your own research.
- Forums
- ASX - Day Trading
- Daytrading July14 afternoon
Put this on your watchlist guys, HEG owns two gold mines in NSW....
-
- There are more pages in this discussion • 249 more messages in this thread...
This thread is closed.
You may not reply to this discussion at this time.
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NEWS
Breakthrough programs slash healthcare events, driving a significant A$1.8M+ annual revenue boost
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries