BUX
looks like it is close to making some news of its own
from Announcement 10/1
Buxton Resources is pleased to provide this update on exploration progress at its 100%-
owned Widowmaker Ni-Cu Project.
Following on from the success of the Airborne VTEM survey flown late last year, the Company has commenced ground Fixed Loop Transient Electromagnetic (FLTEM) and
Moving Loop Transient Electromagnetic (MLTEM) surveys over 14 interpreted bedrock conductors identified in the previous heli-borne VTEM survey (Figure 1).
The ground EM survey is expected to take approximately 3-6 weeks to complete and is designed to further define the orientation and geometry of bedrock conductors.
Clearer definition and modelling of the bedrock conductors will increase the chance of success for the planned drilling program which will commence as soon as practically
possible after the ground EM survey is complete.
- Forums
- ASX - Day Trading
- daytrading march 1 morning
daytrading march 1 morning, page-72
-
- There are more pages in this discussion • 100 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)