Good post shadowboxer, especially the transport side.
SFR's plant, equipment and infrastructure per the DFS was $267m, for a plant half the size and no cobalt, NCu or magnetite extraction. Total cost of all the plant and equipment came in at $246m, per the annual accounts, but this would include the trucks and excavators.
We should be able to confirm what the MPP turnkey installation costs really are from the capital commitments part of CDU's annual report when it comes out.