    Reduced level of production of blister copper to 631 tonnes for the Dec. qtr. This looks bad compared to the Oct. investor presentation that mentioned 1100 tonnes. Hope its a temporary delay. Production target for the March qtr is now 900 tonnes.
    Probably more important is stage two which is supposed to produce 1800 tonnes for the qtr.
    commissioning during April 2006 will bring total production for that qtr to 2700 tonnes. From July onwards this will result in a monthly cash flow of 1 million dollar plus. Lets see
 