"SC55 is a great prospect and I do not think an extention to the drilling time frame would be out of the question by DOE.
Hopefully, Sc55 is drilled before August 2012, but at this stage it does not look good!"
hope you're wrong about this.
Bhp have signed a CONTRACT to drill
Cinco b4 August ???
In reference to the above, BHP are now operator of sc55 and will do as they see fit.
It Would seem DW expedition has substandard blow out preventers and will be out of action by some reports until end of March or possibly latter.
If a suitable rig cannot be secured in the existing time frame how is Sc55 going to be drilled??
I would prefer to see sc55 drilled with as much care and expertise as possible and rushing this prospect would not be prudent in my view.
However BHP are very resource full and hopefully plans will continue in the allotted time frame.
IMO DYOR
- Forums
- ASX - By Stock
- deepwater expedition contract termination
"SC55 is a great prospect and I do not think an extention to the...
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OEL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.001(8.33%) |
Mkt cap ! $62.33M |
Open | High | Low | Value | Volume |
1.2¢ | 1.3¢ | 1.2¢ | $122.8K | 9.870M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 5956783 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 14877106 | 20 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 5956783 | 0.012 |
12 | 10695005 | 0.011 |
18 | 23107452 | 0.010 |
5 | 6792000 | 0.009 |
5 | 595371 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.013 | 12279006 | 16 |
0.014 | 4915902 | 10 |
0.015 | 5027000 | 8 |
0.017 | 72000 | 1 |
0.018 | 209912 | 2 |
Last trade - 16.10pm 16/08/2024 (20 minute delay) ? |
Featured News
OEL (ASX) Chart |