VPR 0.00% 0.1¢ volt group limited

It seems that market needs more info to spell out what exactly...

  1. 145 Posts.
    lightbulb Created with Sketch. 3

    It seems that market needs more info to spell out what exactly ERJ have been doing in the many weeks of precom-missioning their pipes.

    From Wikepedia:

    Pipeline pre-commissioning is the process of proving the ability of a pipeline and piping systems to contain product without leaking. This product may be liquid, gaseous or multiphase hydrocarbons, water, steam, CO2, N2, petrol, aviation fuel etc.

    Pre-commissioning is the series of processes carried out on the pipeline before the final product is introduced. The process during which the pipeline is made "live" i.e. the product is put in the pipeline, is called pipeline commissioning or start-up.

    Despite being seen as an offshoot, or minor part of the business for the larger oil service companies, the pipeline pre-commissioning industry possesses quite a large portfolio of services including, but not limited to the following services:

    Pipeline Cleaning - this is carried out by pushing pigs or gel pigs through the pipeline to remove any debris dirt

    Pipeline Gauging - this is carried out to prove the dimensional quality of the internal diameter of the pipeline

    Pipeline Filling (Flooding) - which can be carried out by propelling pigs through the pipeline with water or free flooding with water (normally for smaller or unpiggable pipelines).

    Hydrotesting - this is a process by which the pipeline in question is pressure tested to a predefined pressure above the operating design pressure of the pipeline.

    Dewatering - this involves pushing pigs through the pipeline propelled by a gas to remove the water prior to start-up.

    Other services include vacuum drying, pneumatic testing, barrier testing, leak testing, decommissioning to mention but a few.

    On the pipeline process pre-commissioning side, there are various services such as chemical cleaning, helium leak detection, bolting, hot oil flushing, pipe freezing, foam inerting etc...

    Other services include valve testing, umbilical testing, hot tapping, leak metering, riser annulus testing.


    In a nutshell : A lot of precom and hands on pipe work to pressure test leaking of liquids prior to the main mission of pushing flying pigs up rising annulus's !

 
watchlist Created with Sketch. Add VPR (ASX) to my watchlist
(20min delay)
Last
0.1¢
Change
0.000(0.00%)
Mkt cap ! $10.71M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
39 76767511 0.1¢
 

Sellers (Offers)

Price($) Vol. No.
0.2¢ 120390463 56
View Market Depth
Last trade - 10.09am 15/11/2024 (20 minute delay) ?
VPR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.