    DEGRUSSA OPEN PIT OXIDE COPPER ORE RESERVE
    DEVELOPMENT OF PROCESSING ROUTE PAVES WAY FOR OXIDE COPPER PRODUCTION
    HIGHLIGHTS
    • Maiden Oxide Copper Ore Reserve (Proved and Probable) for the DeGrussa open pit totalling
    1.04Mt @ 2.3% Cu (23,000t contained copper):
    o Includes 0.47Mt at 2.0% Cu (10,000t contained copper) already mined and stockpiled.
    • This follows the successful development of a processing route for an oxide copper circuit, to
    be located proximal to the 1.5Mtpa DeGrussa concentrator.
    • Design studies and statutory approval processes underway for the oxide processing plant
    and infrastructure, which will have an estimated capital cost of $15-$17M.
    • Processing of oxide copper reserves targeted to commence by mid-CY 2013, providing a lowcost addition to Sandfire’s copper production profile.
    • Additional Massive Sulphide ore brought forward from the Underground to Open Pit Ore
    Reserve, delivering 0.14Mt @ 3.8% Cu (5,000t contained copper).
    Sandfire Resources NL (ASX: SFR; “Sandfire”) is pleased to announce that it has commenced design
    studies and statutory approvals for an oxide copper circuit at its 100%-owned DeGrussa Copper Mine
    in Western Australia following completion of a maiden Oxide Copper Ore Reserve for the open pit,
    which is expected to provide a low-cost, high-margin addition to its production profile.
    The maiden Oxide Copper Ore Reserve – which totals 1.04Mt @ 2.3% Cu for 23,000t of contained
    copper – follows extensive metallurgical testwork which has enabled Sandfire to scope out the design of
    a low-cost recovery circuit for the oxide material.
    Oxide Copper Processing Plant
    Investigations into a suitable processing route for the oxide copper ore commenced in 2011, culminating
    in successful bench-scale processing to produce a saleable concentrate. This has enabled conversion of
    the higher grade portion of the previously announced Measured and Indicated open pit Oxide Copper
    Mineral Resources to Ore Reserves.
    The proposed Oxide Copper Processing Plant will include crushing, wet scrubbing and screening to
    three size fractions, followed by gravity separation at a scoped processing rate of 350-400,000 tonnes
    per annum. This will produce an intermediate concentrate suitable for further batch treatment in the
    1.5Mtpa DeGrussa concentrator through the addition of sulphidising agents allowing conventional
    flotation.
    Testwork completed to date indicates that approximately 40% of the material will be removed by the
    oxide plant, resulting in a 50% increase in grade ahead of delivery to the DeGrussa concentrator. 2
    ASX / Media Release 16 July 2012
    Testwork is continuing aimed at further refinement of the processing route and enhancement of the
    metallurgical performance of the proposed oxide plant. The objective of this testwork is to deliver further
    conversion of in situ Mineral Resources (including current lower grade stockpiles) to Ore Reserves.
    Figure 1 – Oxide ore from the open pit
    Sandfire considers that the DeGrussa concentrator will have sufficient capacity to process the
    sulphidised intermediate oxide material in addition to the 1.5Mtpa of underground massive sulphide ore
    during the early years of operations.
    Subject to final engineering studies, it is estimated that the construction of the Oxide Copper Processing
    Plant, infrastructure and integrating modifications to the DeGrussa concentrator required to integrate the
    new processing circuit will incur a capital cost in the order of $15-$17 million.
    Scoping level estimates indicate an operating cost of around $10-$12 per tonne of Oxide Copper Ore
    Reserves and completed initial testwork indicates an overall metallurgical recovery to saleable
    concentrate of 73% of the contained copper of this material.
    First production from the Oxide Copper Ore Reserve is planned to begin in mid-CY2013, in addition to
    the previously announced annualised production profile in the first three years of operations of 77,000tpa
    of copper and 36,000ozpa of gold.
    DeGrussa Open Pit
    A significant portion of the Oxide Copper Ore Reserve has already been mined and stockpiled as part of
    the DeGrussa open pit operations, which commenced in May 2011. As at the end of March 2012, 0.47Mt
    of copper oxide ore grading 2.0% Cu and 0.7g/t Au had been mined from the open pit and stockpiled in
    close proximity to the planned Oxide Copper Processing Plant.
    Chalcocite below the DSO cut off grade and massive sulphide from the open pit will be stockpiled and
    processed during the commissioning and initial production phases of the 1.5mtpa on-site concentrator
    commencing in Q3 CY2012.
    At the base of the Stage 2 Open Pit is 0.14Mt of massive sulphide ore at a grade of 3.8% Cu which was
    originally included within the Underground Ore Reserve but which will now be mined in the Stage 2 open
    pit and is planned to be processed in mid-CY 2013.
    As a result of this massive sulphide now being mined as part of the open pit and the maiden Oxide
    Copper Ore Reserve, the overall Open Pit Ore Reserve for the DeGrussa Project, stated as at 31 March
    2012, total 1.63Mt @ 4.9% Cu, 1.2g/t Au for 79,000 tonnes of contained copper and 64,000 ounces of
    contained gold.
    Further detail of the open pit Ore Reserves is provided in Table 1 and a schematic representation of the
    distribution of the reserves is shown in Figure 2.
    DeGrussa Laterite Gold Processing
    Sandfire is also pleased to advise that it has signed an Ore Sale and Purchase Agreement with Barrick
    (Plutonic) Ltd to process the lateritic gold material mined as part of the open pit operations. Some 0.1Mt
    of this material at an average grade of 3.0g/t (9,000oz contained gold) has been mined and stockpiled.
    The current schedule for this material, which is included in the Reserve Statement in Table 1, is to be
    processed before the end of CY2012.


    http://asx.com.au/asxpdf/20120716/pdf/427dzlzjg3xblq.pdf
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
$12.32
Change
-0.160(1.28%)
Mkt cap ! $5.656B
Open High Low Value Volume
$12.40 $12.45 $12.31 $20.32M 1.644M

Buyers (Bids)

No. Vol. Price($)
3 180 $12.30
 

Sellers (Offers)

Price($) Vol. No.
$12.38 1812 2
View Market Depth
Last trade - 16.13pm 18/09/2025 (20 minute delay) ?
SFR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.