AEV 0.00% 1.2¢ avenira limited

delay with mining, page-48

  1. 713 Posts.
    "For the record an Ericsson Skycrane can lift around 10,000kg so it could easily lift something like a small bulldozer D3 or D4. (Has been done in the US for firefighting situations)"

    scitty,
    is not as straightforward as that. When we organise slung loads, it can take weeks of planning. By the time we had organised it, the waters will have subsided.
 
watchlist Created with Sketch. Add AEV (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
0.000(0.00%)
Mkt cap ! $32.44M
Open High Low Value Volume
1.2¢ 1.2¢ 1.2¢ $19.95K 1.662M

Buyers (Bids)

No. Vol. Price($)
8 2450738 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.2¢ 1000000 1
View Market Depth
Last trade - 15.43pm 13/09/2024 (20 minute delay) ?
AEV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.