In September Legend were still talking about the slurry pipeline:
http://www.lgdi.net/resources/i/docs/Presentations/Corporate%20Pres%20September%202008.pdf
However, in October they said:
"An early focus at D-Tree will be the identification of high grade mineralisation suitable for potential direct shipment via the Mt Isa railhead (87 miles distant by road)."
http://www.lgdi.net/resources/i/docs/Press%20Releases/PR_081028.pdf
...and in November a broker report (after a site visit) doesn't mention the pipeline once, because they are now going with trucking and rail for initial production:
http://www.lgdi.net/resources/i/docs/Presentations/BMO_Joel_Jackson_report_17NOV08.pdf
Just like MAK.
- Forums
- ASX - By Stock
- AEV
- delay with mining
delay with mining, page-69
-
-
- There are more pages in this discussion • 16 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AEV (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $21.14M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AEV (ASX) Chart |
Day chart unavailable