LDKS, Why on earth would you even consider slurry when you are right beside the highway? Why would you consider slurry when it is highly likely a railway will be built eventually? Slurry is very high capex and a waste of time even evaluating. Kegend had to consider it because there were very few other choices available to them.
Stock to low CAPEX, short-term explorer to producer option. It all seems very logical to me. Cant quite understand how you could even really question it.
- Forums
- ASX - By Stock
- AEV
- delay with mining
delay with mining, page-70
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AEV (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $21.14M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AEV (ASX) Chart |
Day chart unavailable