I suspect that Vulcan Energy wants to transport lithium chloride, product from the DLE, in the Pipeline from Landau to Insheim.
So you only need one location, for the transport to Frankfurt Höchst.Behind this is still the idea of transport by ship on the Rhine. Behind this is still the idea of transport by ship on the Rhine.This would mean another pipeline to the Rhine and perhaps a landing stage.A tank farm for the lithium chloride may also be needed. Let's see how Vulcan will implement this.
Both geothermal power plants need their own DLE so that the thermal water has short pathways.
These are really good prospects for Vulcan Energy.Geothermal opponents will almost certainly be very angry about this.
Thank you at this point for the great aerial photos of the two geothermal power plants that you had created.
- Forums
- ASX - By Stock
- Demonstration Plant in Landau (March 2022)
I suspect that Vulcan Energy wants to transport lithium...
-
-
- There are more pages in this discussion • 166 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VUL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$4.89 |
Change
-0.120(2.40%) |
Mkt cap ! $920.2M |
Open | High | Low | Value | Volume |
$5.04 | $5.10 | $4.86 | $1.824M | 368.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1995 | $4.88 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.90 | 1014 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 1995 | 4.880 |
2 | 5205 | 4.870 |
6 | 11854 | 4.860 |
4 | 10160 | 4.850 |
4 | 14065 | 4.840 |
Price($) | Vol. | No. |
---|---|---|
4.960 | 5445 | 2 |
4.980 | 1907 | 1 |
5.020 | 10000 | 1 |
5.040 | 3491 | 1 |
5.050 | 35000 | 2 |
Last trade - 16.10pm 04/11/2024 (20 minute delay) ? |
Featured News
VUL (ASX) Chart |