Why do you think that every plant needs a dedicated DLE facility? If you take a close look at the latest Vulcan presentation they are also talking about a "central DLE facility". Also both geothermal plants are pretty close to each other (less than 5km). Also: the water needs to cool down for the usage in DLE, might well be, that they will use the heating network in Landau (which is currently heated by a fossil fuel plant directly adjacent to the Landau geothermal plant) to cool down the brine before sending it to the DLE.
This is really getting interesting now ... so many possibilities what can be achieved here in Landau. And then there is also Mannheim area. I'm really positive here. VUL still seems at this point like a once in a lifetime chance
- Forums
- ASX - By Stock
- VUL
- Demonstration Plant in Landau (March 2022)
Demonstration Plant in Landau (March 2022), page-135
-
-
- There are more pages in this discussion • 165 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VUL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$4.90 |
Change
0.010(0.20%) |
Mkt cap ! $920.2M |
Open | High | Low | Value | Volume |
$4.90 | $4.95 | $4.87 | $127.4K | 26.01K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 2310 | $4.88 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.90 | 3 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 950 | 4.890 |
7 | 2287 | 4.880 |
7 | 11421 | 4.870 |
7 | 5871 | 4.860 |
6 | 9736 | 4.850 |
Price($) | Vol. | No. |
---|---|---|
4.910 | 812 | 3 |
4.920 | 1219 | 4 |
4.930 | 6326 | 1 |
4.940 | 2835 | 3 |
4.950 | 3186 | 3 |
Last trade - 10.37am 05/11/2024 (20 minute delay) ? |
Featured News
VUL (ASX) Chart |