ACCLAIM EXPLORATION N.L.
ABN 99 009 076 233
20 July 2006
Companies Announcements Office
Australian Stock Exchange Limited
20 Bridge Street
Sydney NSW 2000
Denny Dalton Drilling Progress Report
• Five Holes Completed
• Hole Depth Average 25 m to 45 m
• Core samples being cut for assaying
The company is pleased to announce that 5 of the initial 11 targets have been completed at Denny Dalton. Refer attached map.
The new core splitter has arrived on site and work has commenced on the core sampling. This includes preparation for transportation to Johannesburg and assaying by SGC Lakefield. Their website is www.met.sgs.com
Upon the completion of this first phase drill program a second drill program has been proposed by Caracle Creek International Consulting Group (CCIC). This will compliment the first program with holes collared to assist in calculating the initial resource. The exact number of holes to be drilled during this phase can not be provided. However a minimum of 10 holes further out from the known mineralised area will be undertaken – all targeting an extension of the Mozan Contact Reef (MCR) payshoot.
Denny Dalton is situated at the southern most end of a major Precambrian basin in which deep erosion has stripped away the cover rocks and exposed the units of the Pongola Super Group. This Pongola basin is compatible in size with the Witwatersrand but about 300 million years older. The Pongola rocks are estimated to be 3.1–2.9 billion years compared with the Witwatersrand which spans 2.75 – 2.5 billion years. Mineralisation at Denny Dalton occurs as shoots of gold and uranium concentrations within conglomerate beds at the base of the Mozaan Group. These conglomeritic beds outcrop over a strike area of approximately 4km with the Mozaan Contact Reef the principal economic horizon lying unconformably on the Insuzi Lava Formation. Previous stratigraphy above the MCR, have shown to have economic potential both for gold and uranium.
Yours faithfully
Neville J Bassett
Secretary
Suite B 150 Hay St Subiaco Western Australia 6008
Telephone: + 61 8 9388 8436 Facsimile: + 61 8 9388 8450
Page 2
- Forums
- ASX - By Stock
- AEX
- denny dalton drilling progress report
denny dalton drilling progress report
-
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AEX (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online