PDN's LH contains the following U308 measured/indicated/inferred resource at stage 1&2 with a 300ppm cut-off,
25.3 million tonnes / grade .07% / 18,500 tonnes U308.
U308 - 185000 tonnes = 40,700,000lbs
U308 - 40,700,000lbs x us$41 = us$1,668,700,000
us$1,668,700,000 / 25.3 million tonnes = us$66/tonne.
so LH contains us$66 of resource per tonne.
Denny Dalton contains an inferred 11,000 tonnes of U308 and 2.5 million ounces of AU.
U308 - 11,000 tonnes = 24,200,000lbs
U308 - 24,200,000lbs x us$41 = us$992,200,000
AU - 2,500,000ounces x us$580 = us$1,450,000,000
us$2,442,200,00 / 31.5 million tonnes = us$77 of resource per tonne.
so DD contains us$11 more resource per tonne than PDN's LH project.
pretty basic calculation but may help to answer those questioning the viability of grades etc at DD.
any other suggestions????
- Forums
- ASX - By Stock
- AEX
- denny dalton feasability
denny dalton feasability
-
- There are more pages in this discussion • 103 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)