i'd say that the directors are seriously considering the implications this stop lynas movement, in terms of how long it may be ongoing.
i'm not picking sides, but imo, is is not a good thing if a leader of the local community is spearheading an opposition campaign which has potential to gather support.
this is something that lynas could well do without.
- Forums
- ASX - By Stock
- LYC
- design problems, hazardous construction plague
design problems, hazardous construction plague, page-6
-
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LYC (ASX) to my watchlist
(20min delay)
|
|||||
Last
$7.75 |
Change
0.030(0.39%) |
Mkt cap ! $7.244B |
Open | High | Low | Value | Volume |
$7.71 | $7.81 | $7.63 | $12.03M | 1.561M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 6556 | $7.73 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$7.77 | 3385 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2000 | 7.640 |
3 | 20260 | 7.600 |
1 | 3000 | 7.550 |
2 | 2833 | 7.500 |
1 | 2000 | 7.430 |
Price($) | Vol. | No. |
---|---|---|
7.840 | 293 | 1 |
7.850 | 6064 | 3 |
7.870 | 2000 | 1 |
7.890 | 8800 | 2 |
7.900 | 24269 | 7 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
LYC (ASX) Chart |