I’m not stressing about this at all, sounds like a standard procedural process. Permit granted, others have a right to appeal which will get tossed out quickly and the permit is then valid. That way these people can’t jump up and down saying we didn’t consult with the community etc because they had their chance. All it will cost us is a week or two more wait time, which is immaterial in the grand scheme of things.
- Forums
- ASX - By Stock
- Detailed info on hartog drilling from department of mining
I’m not stressing about this at all, sounds like a standard...
-
-
- There are more pages in this discussion • 62 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CHN (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.55 |
Change
-0.050(3.13%) |
Mkt cap ! $601.0M |
Open | High | Low | Value | Volume |
$1.56 | $1.59 | $1.50 | $3.657M | 2.364M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 1298 | $1.54 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.55 | 9737 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 1298 | 1.540 |
2 | 17076 | 1.525 |
1 | 20000 | 1.515 |
2 | 25100 | 1.510 |
10 | 54288 | 1.500 |
Price($) | Vol. | No. |
---|---|---|
1.545 | 9737 | 1 |
1.550 | 17142 | 3 |
1.580 | 5000 | 1 |
1.590 | 15000 | 2 |
1.595 | 18328 | 2 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
NEWS
Antler Copper Project hits major permitting milestone – air quality permit advances to final review
CHN (ASX) Chart |