Hangseng am I missing something or is this "optomisation" already included in the PFS ?
As far as I can recall the entire PFS and permitting is based on a central processing plant design with the loaded solution piped from the production wells. There is also allowance in the Capex costing for satelite processing plants, presumably when the wells reach a point too far from the CPP for piping to be practical.
Are you referring to some kind of additional optomisation beyond what the PFS has included ?
Thanks
- Forums
- ASX - By Stock
- PEN
- dfs and design optimisation
dfs and design optimisation, page-16
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PEN (ASX) to my watchlist
|
|||||
Last
10.5¢ |
Change
0.005(5.00%) |
Mkt cap ! $334.4M |
Open | High | Low | Value | Volume |
10.5¢ | 10.5¢ | 10.0¢ | $286.0K | 2.758M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
81 | 8753070 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 3414062 | 21 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 336248 | 0.120 |
81 | 8753070 | 0.100 |
6 | 567686 | 0.099 |
12 | 498440 | 0.098 |
8 | 1011092 | 0.097 |
Price($) | Vol. | No. |
---|---|---|
0.095 | 11001 | 1 |
0.098 | 42777 | 4 |
0.099 | 10399 | 1 |
0.100 | 163792 | 4 |
0.105 | 6179360 | 26 |
Last trade - 16.10pm 10/07/2024 (20 minute delay) ? |
Featured News
PEN (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online