PEN 6.00% 9.4¢ peninsula energy limited

Hangseng am I missing something or is this "optomisation"...

  1. 1,069 Posts.
    Hangseng am I missing something or is this "optomisation" already included in the PFS ?

    As far as I can recall the entire PFS and permitting is based on a central processing plant design with the loaded solution piped from the production wells. There is also allowance in the Capex costing for satelite processing plants, presumably when the wells reach a point too far from the CPP for piping to be practical.

    Are you referring to some kind of additional optomisation beyond what the PFS has included ?

    Thanks
 
watchlist Created with Sketch. Add PEN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.