Hangseng am I missing something or is this "optomisation" already included in the PFS ?
As far as I can recall the entire PFS and permitting is based on a central processing plant design with the loaded solution piped from the production wells. There is also allowance in the Capex costing for satelite processing plants, presumably when the wells reach a point too far from the CPP for piping to be practical.
Are you referring to some kind of additional optomisation beyond what the PFS has included ?
Thanks
- Forums
- ASX - By Stock
- dfs and design optimisation
Hangseng am I missing something or is this "optomisation"...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
KAI
Pilbara Minerals buys land off Kairos part of its York gold project for $20M – and a 2% royalty on any PLS gold sales
MND
Albemarle lithium downsize burns $200M hole in Monadelphous's pocket as latter's contracts terminated
Add PEN (ASX) to my watchlist
|
|||||
Last
9.4¢ |
Change
-0.006(6.00%) |
Mkt cap ! $299.5M |
Open | High | Low | Value | Volume |
9.8¢ | 9.8¢ | 9.0¢ | $3.839M | 40.99M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 2740 | 9.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.4¢ | 315192 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2740 | 0.093 |
2 | 215855 | 0.092 |
8 | 309973 | 0.091 |
32 | 1668903 | 0.090 |
5 | 355235 | 0.089 |
Price($) | Vol. | No. |
---|---|---|
0.094 | 315192 | 2 |
0.095 | 1000000 | 1 |
0.096 | 50001 | 2 |
0.097 | 297682 | 2 |
0.098 | 149100 | 2 |
Last trade - 16.10pm 02/08/2024 (20 minute delay) ? |
Featured News
KAI
Pilbara Minerals buys land off Kairos part of its York gold project for $20M – and a 2% royalty on any PLS gold sales
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
PEN (ASX) Chart |