PEN 2.50% 10.3¢ peninsula energy limited

Hangseng am I missing something or is this "optomisation"...

  1. 1,069 Posts.
    Hangseng am I missing something or is this "optomisation" already included in the PFS ?

    As far as I can recall the entire PFS and permitting is based on a central processing plant design with the loaded solution piped from the production wells. There is also allowance in the Capex costing for satelite processing plants, presumably when the wells reach a point too far from the CPP for piping to be practical.

    Are you referring to some kind of additional optomisation beyond what the PFS has included ?

    Thanks
 
watchlist Created with Sketch. Add PEN (ASX) to my watchlist
(20min delay)
Last
10.3¢
Change
0.003(2.50%)
Mkt cap ! $334.4M
Open High Low Value Volume
10.5¢ 10.5¢ 10.0¢ $206.7K 2.000M

Buyers (Bids)

No. Vol. Price($)
89 11883818 10.0¢
 

Sellers (Offers)

Price($) Vol. No.
10.5¢ 6886911 36
View Market Depth
Last trade - 13.55pm 10/07/2024 (20 minute delay) ?
PEN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.