PEN 4.76% 10.0¢ peninsula energy limited

dfs, page-3

  1. 2,883 Posts.
    Definitive Feasibility Study - A feasibility study is an engineering study based on test work and engineering analysis, which presents enough information to determine whether or not the project should be advanced to the final engineering and construction stage.

    Thats the best explanation I can give you.
 
watchlist Created with Sketch. Add PEN (ASX) to my watchlist
(20min delay)
Last
10.0¢
Change
-0.005(4.76%)
Mkt cap ! $318.6M
Open High Low Value Volume
10.0¢ 10.5¢ 9.8¢ $1.946M 19.47M

Buyers (Bids)

No. Vol. Price($)
1 131212 10.0¢
 

Sellers (Offers)

Price($) Vol. No.
10.5¢ 2355724 29
View Market Depth
Last trade - 16.10pm 25/07/2024 (20 minute delay) ?
PEN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.