MPJ 0.00% 0.0¢ mining projects group limited

Diamond Drilling Roe Hills Project, page-2

  1. 824 Posts.
    lightbulb Created with Sketch. 25
    I like your thoughts regarding Diamond Drilling.
    Drill depths for each hole range from 200 - 500m totalling 5000m.
    With HQ collar, core recovery every 3mtrs to a depth of 500mtrs should only take 4-5 days with good ground.
    Then move to next hole
    My thoughts anyway
 
watchlist Created with Sketch. Add MPJ (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.